What the plant can do — and what it cannot
A capability page that only lists strengths is a brochure. This page states the process routes, the equipment classes, and the work we would send elsewhere.
Process routes
| Route | What it is for | Typical strength | Where it stops working |
|---|---|---|---|
| Compression moulding | Flat and shaped seals, thick sections, low to medium volume | Low tooling cost, tolerant of thick sections | Long cycle times; flash and deflashing on intricate edges |
| Transfer moulding | Intricate shapes, inserts, sections that are hard to preform | Better dimensional control on complex geometry | Higher tooling cost; pot and sprue waste |
| Extrusion | Constant cross-section profiles, cord, bulb and lip seals | Very low die cost, continuous length | Tight tolerances across the section; undercuts are not possible |
| Bonded / over-moulding | Rubber-to-metal or rubber-to-plastic assemblies | Part consolidation, defined stiffness | Substrate preparation and bond control add cost and risk |
| Plastic parts (partner route) | Rigid inserts, housings and low-volume plastic parts | Available through a qualified partner, not made in this plant | Warp, shrinkage and tooling ownership sit with the partner and are stated in the quotation |
Equipment classes
Counts and tonnages are placeholders until the client supplies the asset list. An equipment list is the fastest way for a buyer to judge what a plant can actually take on.
| Stage | Equipment | Why a buyer cares |
|---|---|---|
| Mixing | Internal mixer and open mill qty to confirm | In-house compound control vs buying ready-mixed stock |
| Moulding | Compression presses, transfer presses, injection units tonnage to confirm | Maximum part size and cavity count |
| Extrusion | Hot and cold feed extruders, vulcanisation line to confirm | Profile size range and output rate |
| Tooling | In-house or outsourced mould making to confirm | Tool lead time and cost, and who owns the tool |
| Testing | Tensile tester, hardness, ageing oven, projector / CMM to confirm | Which reports can be issued in-house vs external |
From drawing to shipment
Manufacturability
Geometry, tolerance stack, material callout and any standard named by the buyer. Output: a written review with open questions.
Tooling and piece price
Tooling options with tool life stated, piece price at stated volumes, and the assumptions the price depends on.
First article
Samples with dimensional report and material batch record. Anything out of tolerance is reported, not shipped quietly.
Batch and inspect
Batch traceability, in-process checks and pre-shipment inspection against the agreed plan.
Buyer questions
What happens if you cannot hold the tolerance on my drawing?
We say so in the review, before tooling. Either the dimension is relaxed to a class the process can hold, or the part is re-routed to a different process, or we decline. Discovering it at first article is expensive for both sides.
Can I see the plant before placing an order?
Yes. Buyers or their agents are welcome to visit, and a video walkthrough can be arranged if travel is not practical. An audit checklist can be agreed in advance so the visit answers the questions that matter to you.
Do you do prototyping as well as production?
Yes. Prototype tooling, bridge tooling and production tooling are quoted as separate options with different tool life, so the buyer can decide how much to invest before the design is frozen.
What is your capacity?
Capacity is stated per process and per tooling route in the quotation, because it depends on machine allocation rather than a single plant-wide number. The figure on any page of this site marked TO BE CONFIRMED is a placeholder.
Ask a process question before you ask for a price
Tell us the part, the media and the tolerance. We will tell you which route fits and where the risk is.
Request a quote